Hello, welcome to Shandong Greenism Environmental Protection Technology Co., Ltd
Customer service telephone:0536-3955900
Time: 2024-05-24 10:20:43
From: 格润内泽姆
Click:
In May, when the flowers were in full bloom, Grunezem's market development reported another success and successfully won the bid for the CHP2 cogeneration water treatment project in Almaty, Kazakhstan.

The CHP2 cogeneration project in Almaty, Kazakhstan is located in Almaty, the largest city in the Republic of Kazakhstan. The thermal power plant to be renovated is the largest thermal power plant in Kazakhstan, with an installed capacity of 510 megawatts. It bears the main responsibility of providing electricity and heating for the production and daily life of residents in the city. As a modern coal to gas project, it is committed to replacing the existing coal-fired CHPP-2 with a new gas GTT CHPP. Through the construction of new gas turbine combined cycle cogeneration units, it aims to improve the utilization rate of clean energy in Kazakhstan, accelerate energy conservation and emission reduction, optimize the local development environment, and benefit people's well-being. The construction of the project will strongly promote the development of clean energy in Kazakhstan, promote the transformation of economic structure, and is expected to become a new landmark project of high-quality joint construction of the "the Belt and Road" between China and Kazakhstan.

Our company has won the bid for the boiler feedwater treatment system, circulating water treatment system, raw water treatment and re mineralization and disinfection system in this project. Our winning bid covers the main water treatment system of this project, which is crucial for the smooth operation of the entire project. Among them, the inlet water of the boiler feedwater system is pre desalinated fresh water. After being treated by the boiler feedwater system equipment, the system outlet water is used as water for the power plant waste heat boiler and closed water systems. The inlet water of the raw water pretreatment system is filtered by the old plant water treatment workshop. After being treated by the raw water system equipment, the system effluent is sent to the boiler make-up system for further treatment. The inlet of the circulating water treatment system is the circulating cooling wastewater, which is treated by the circulating water system equipment and used as a supplementary water source for the circulating cooling water system.

The successful bidding of this project reflects the client's recognition of the technical level and execution ability of Gerun Nezem's overseas projects, and lays a solid foundation for the company's continuous development and deepening of the Central Asian green energy market. Grunezem will continue to be customer-centric, with a spirit of persistence, responsibility, innovation, and unity, carefully creating high-quality projects, and striving to become a leading enterprise in the industry trusted and respected by customers.
Writing | Marketing Department
Editor | Yan Jing
Reviewed by Tang Wenzhou