With the increasing requirements of environmental protection, energy conservation and emission reduction and the reality of water shortage, power plants pay more attention to the utilization rate of water resources. At the same time, in order to save investment and reduce operation cost, the water system construction of the power plant tends to combine and centralize the "water purification station / reclaimed water advanced treatment station + chemical water workshop + wastewater treatment workshop" (referred to as "three water in one") or "water purification station + chemical water workshop + circulating cooling water treatment workshop + wastewater treatment workshop" (referred to as "four water in one") for the purpose of comprehensive utilization of water resources.

Schematic diagram of power plant boiler replenishment water flow

The pre-processing filtration system is centrally arranged
With years of technical accumulation and practical experience in the field of water treatment in power plants, Greenism has launched the power plant water island technology based on Greenism environmental protection concept. Through the overall design of pretreatment, boiler make-up water and wastewater, the utilization rate of water resources in power plant is greatly improved, the layout of water island in power plant is more reasonable, and the operation and maintenance is more convenient.

Ultrafiltration and reverse osmosis are centrally arranged

The ion exchanger system is centrally arranged

3D renderings of water island in power plant